Question: 1 / 400

What must be done before starting demolition on a building?

Notify the local authorities

Call dig safe and ensure all utilities are disconnected

Before starting demolition on a building, it is crucial to ensure that all utilities are disconnected. This involves calling a utility notification service, often referred to as "dig safe," to identify and mark underground utilities such as gas, electric, water, and sewage lines. This step is vital for the safety of workers and the public, as well as for preventing damage to existing infrastructure.

If utilities are not properly addressed prior to demolition, serious accidents could occur, including gas leaks, electrical hazards, or damage to water lines, all of which could pose significant safety risks. Ensuring that these services are identified and disconnected minimizes the potential for accidents and makes the demolition process safer overall. Additionally, by taking this precaution, you are complying with legal requirements and industry best practices, establishing a foundation for a safe demolition operation.

Get further explanation with Examzify DeepDiveBeta

Perform a structural integrity assessment

Obtain a demolition permit